NRCS EWP Improvements for Trautman Bayou at Magnolia Drive

Status

Pending

Company & Contacts

Pickering Firm
Austin Keith  
228-432-5925

Location

Long Beach, MS

Bid information:

Due to delays caused by easement and property issues which affected the timeline for current funding for the project, this project is hereby cancelled until new funding can be secured. This is currentlyestimated to take 2-3 months.

Project Description:

  • Removal of debris and minimal channel shaping and excavation necessary for positive drainage along approximately 3,655 linear feet of Trautman Bayou beginning at Highway 90 and ending at the CSX right-of-way.
  • Removal of 525 linear feet of existing 72-inch corrugated metal pipe around Magnolia Street and the placement of 107 linear feet of 72-inch reinforced concrete pipe along with two concrete rectangular headwalls.

———————————————————————————————