AWG Infrastructure Improvements - Overlay and Shoulder Widening of Green T Road

In general, the project consists of widening Green T Road to provide stabilized shoulders and overlaying the existing lanes from Highway 51 to the realigned McIngvale Road. All other related items of work required to complete the project as shown and specified in the Contract Documents.
Addenda (click to expand/collapse)
Prior to the date set for opening of Bids, the right is reserved, as the interests of the
OWNER may require, to revise or to amend the Contract Documents or Construction Drawings.
Such revisions, if any, will be announced by an Addendum or Addenda, and copies of such
Addenda will be furnished to all known Bidders for acknowledgement on the proposal form. If
the revisions and Addenda are of a nature requiring material changes in quantities or prices bid,
or both, the date set for opening Bids may be postponed to enable Bidders to revise their Bids.
In such case, the Addendum, or Addenda will include an announcement of the new date for
opening Bids.
Name Size
25971.00 - Addendum No. 1 708.7 KB